log [2026/05/28 09:35] – [13th Meeting (2026-05-28)] team6log [2026/06/03 15:51] (current) – [14th Meeting (2026-06-03)] team6
Line 141: Line 141:
  
 ==== 11th Week Report ==== ==== 11th Week Report ====
 +
 +This week we worked intensively on our prototype. First, we calculated all the dimensions and clearly brought the individual components together to create a clear structure for the structure. The basic structure of the prototype was then built. PVC pipes form the basic framework, which was connected to each other using old garden hoses.
 +In addition, we firmly secured the construction at the intersection points with adhesive tape.
 +
 +We also carried out various functional tests. The hardware sensors were tested for accuracy, especially the light, temperature and air quality sensors. We also checked the responsiveness of the actuators, with both the scent sprayer and the audio system triggering immediately and reliably. We also tested the stability of the web application under load. This achieved an error rate of 0% with an average response time of just 34 milliseconds. All tests carried out were passed successfully.
 +
 +==== 12th Week Report ====
 ===== Meetings ===== ===== Meetings =====
  
Line 348: Line 355:
   * Prototype   * Prototype
   * Functionnal tests   * Functionnal tests
-  * Leaflet/poster? 
  
-Link to [| Presentation]+Link to [[https://myisepipp-my.sharepoint.com/:p:/r/personal/1252455_isep_ipp_pt/Documents/Presentation.pptx?d=wc372894d56fc4d47b0cc80a5ad9d1d71&csf=1&web=1&e=gubkD2| Presentation]]
  
 === Minute: === === Minute: ===
 +On the meeting we discussed our progress on prototype development. We looked into the instructions that we prepared (containing the step-by-step path, dimensions and materials) and compared this to the outcome. We need to work more on exact dimensioning for the structure we have, also it was suggested by the supervisors to change assembly method for joints. We used tape, but the 3D printed joints could work better. This proposition is later to be discussed with the group. 
 +Next, we looked through the paper, that we definitely need to shorten up and that we need to polish. 
 +
 +==== 14th Meeting (2026-06-03) ====
 +=== Agenda: ===
 +  * Prototype
 +  * Functionnal tests
 +  * 3D model
 +
 +Link to [[https://www.canva.com/design/DAHLWXdj_eA/ZMdAlVVGh9xboik4I2Mgyg/edit| Presentation]]
 +
 +=== Minute: ===
 +- think and design the 3D piece on SOLIDWORKS to connect the lower tubes (so the part must to be T-shaped).
 +- do the video explaining our product (1-3 minutes)
 +- finish the paper: add the abstract, add all functional tests and explain them
 +
 +
 +==== 15th Meeting (2026-06-11) ====
 +=== Agenda: ===
 +  * 
 +
 +
 ===== Activities ===== ===== Activities =====
 //Please register here all accomplished project activities// //Please register here all accomplished project activities//
  • log.1779957349.txt.gz
  • Last modified: 2026/05/28 09:35
  • by team6