report:prm

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
report:prm [2026/06/12 22:02] – [Sprint 9] team6report:prm [2026/06/14 00:05] (current) – [Summary] team6
Line 455: Line 455:
 <WRAP centeralign> <WRAP centeralign>
 <figure fig:Sprint5retro> <figure fig:Sprint5retro>
-{{ :report:sprint_5_retro.png?direct&600 |}}+{{ :report:sprint_5_retro.png?direct& |}}
 <caption>Sprint 5 retrospective</caption> <caption>Sprint 5 retrospective</caption>
 </figure> </figure>
Line 466: Line 466:
 <WRAP centeralign> <WRAP centeralign>
 <figure fig:Sprint6retro> <figure fig:Sprint6retro>
-{{ :report:sprint_6_retro.png?direct&600 |}}+{{ :report:sprint_6_retro.png?direct& |}}
 <caption>Sprint 6 retrospective</caption> <caption>Sprint 6 retrospective</caption>
 </figure> </figure>
Line 477: Line 477:
 <WRAP centeralign> <WRAP centeralign>
 <figure fig:Sprint7retro> <figure fig:Sprint7retro>
-{{ :report:sprint_7_retro.png?direct&600 |}}+{{ :report:sprint_7_retro.png?direct& |}}
 <caption>Sprint 7 retrospective</caption> <caption>Sprint 7 retrospective</caption>
 </figure> </figure>
Line 488: Line 488:
 <WRAP centeralign> <WRAP centeralign>
 <figure fig:Sprint8retro> <figure fig:Sprint8retro>
-{{ :report:sprint_8_retro.png?direct&600 |}}+{{ :report:sprint_8_retro.png?direct& |}}
 <caption>Sprint 8 retrospective</caption> <caption>Sprint 8 retrospective</caption>
 </figure> </figure>
Line 525: Line 525:
  
 ==== Summary ==== ==== Summary ====
-//Provide here the conclusions of this chapter and make the bridge to the next chapter.//+ 
 +This chapter summarised the project management approach used for developing the Healing Cocoon prototype, a proof-of-concept designed to reduce anxiety in children in clinical waiting environments. The project scope focused on research, design, and development, organised using a Work Breakdown Structure (WBS) to structure tasks and responsibilities. 
 + 
 +The project was managed through short, structured development cycles with weekly planning sessions and Jira task tracking, enabling steady progress and flexibility over the 15-week timeline. The project was completed within a €100 budget by prioritising low-cost materials and components while maintaining core functionality. 
 + 
 +Quality was ensured through iterative testing, supervisor feedback, and a focus on safety, hygiene, accessibility, and reliability. Key stakeholders, including healthcare professionals, patients, supervisors, and suppliers, were considered throughout development. 
 + 
 +Communication was maintained using WhatsApp, Microsoft Teams, Outlook, and Jira to support effective collaboration. Risks were continuously identified and mitigated, while procurement decisions balanced cost, performance, and availability. 
 + 
 +Overall, this structured and iterative development process, supported by continuous feedback, allowed the team to deliver a functional prototype within the defined constraints of scope, time, cost, and quality. 
  • report/prm.1781298165.txt.gz
  • Last modified: 2026/06/12 22:02
  • by team6