start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
start [2026/03/05 11:32] – [Contacts] team6start [2026/03/30 09:35] (current) – [Project Brief] team6
Line 1: Line 1:
-//This is your project wiki. It should be updated every week to edit:// +====== Healing Cocoon ======
-  * //the weekly report// +
-  * //the minute of the last meeting//  +
-  * //the agenda of the next meeting// +
-  * //the report.// +
- +
-//Please use the MS Teams channel of your team for sharing and holding project-related data.// +
-====== Healing Spaces ====== +
- +
  
 +{{:logo_group_6.png?400| Logo Healing Spaces}}
 ===== Sponsor ===== ===== Sponsor =====
 The sponsor of this project is Instituto Superior de Engenharia do Porto. [[https://www.isep.ipp.pt/|ISEP]] The sponsor of this project is Instituto Superior de Engenharia do Porto. [[https://www.isep.ipp.pt/|ISEP]]
  
 ===== Project Brief ===== ===== Project Brief =====
-The goal is to ...+The goal of the Healing Coccon is a self-contained immersive pod designed for hospitalized children to escape into a fully personal sensory worldBy stepping inside the cocoon, children are surrounded by projected visuals, ambient sound, and therapeutic scents that create a safe, isolating them from the clinical environment and reducing stress, anxiety, and pain perception during their hospital stay. 
  
 The project requirements are: The project requirements are:
-  - ... (//specify here your project requirements//);+  - Our project requirements: 
 +    - Therapeutic Design: Create an enclosed, calming sensory environment that emotionally disconnects the child from the hospital setting during use. 
 +    - Smart Technology: Enable content personalization, drawing-to-projection features and caregiver app integration. 
 +    - Modular & Scalable Design: Ensure the cocoon is easy to assemble, transport between rooms, and adaptable to different content and hospital needs. 
 +    - Energy Efficiency: Optimize power consumption for continuous hospital use. 
 +    - User Accessibility: Design the entry, interior space, and controls to accommodate children of all ages, sizes, and physical conditions, including those with limited mobility. 
 +    - Health & Safety Compliance: Meet European regulations for medical-grade electrical equipment, enclosed-space ventilation, and infection control standards. 
 +    - Durability & Hygiene: Ensure all interior and exterior surfaces withstand regular clinical disinfection without degradation. 
 +    - Business Feasibility: Consider cost-effective production, hospital procurement and storage constraints, and long-term operational viability.
   - Comply with the following EU Directives:   - Comply with the following EU Directives:
     - Electromagnetic Compatibility Directive ([[https://ec.europa.eu/growth/sectors/electrical-and-electronic-engineering-industries-eei/electromagnetic-compatibility-emc-directive_en|EMCD]]);      - Electromagnetic Compatibility Directive ([[https://ec.europa.eu/growth/sectors/electrical-and-electronic-engineering-industries-eei/electromagnetic-compatibility-emc-directive_en|EMCD]]); 
Line 80: Line 81:
       * linkedin       * linkedin
   * Anouc Daindu Goedhart   * Anouc Daindu Goedhart
-      * username@mailserver+      * 1252461@isep.ipp.pt
       * linkedin       * linkedin
    
  • start.1772710361.txt.gz
  • Last modified: 2026/03/05 11:32
  • by team6